Handmade quality · Free shipping over $75 · Explore the atelier

B10 Summary Sheet - Post Frame Installation and Temporary Restraint and Bracing (50 copies) B6 Summary Sheet providing options for safe temporary

SKU: 83114358434

4.8
USD114.00 USD146.00

Pay in 4 interest-free payments of $28.50 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Aug 5 - Aug 10

Description

providing options for safe temporary restraint/bracing installations and strongly emphasizing how all lateral restraint must be stabilized with diagonal bracing

00  Non-Member Price $250

Help your customer differentiate between truss arching or uplift and partition separation

Spread the news about the advantages of floor trusses

B10 Summary Sheet - Post Frame Installation and Temporary Restraint and Bracing (50 copies) B6 Summary Sheet providing options for safe temporaryPlease note that recommendations for the installation and bracing of trusses spaced more than two feet on center has been moved to the new BCSI B6 Summary Sheet. Metal plate connected wood trusses are commonly used in post frame construction. This Summary Sheet provides guidelines for the proper bracing of engineered post frame building systems. Includes English Spanish. Contains 50 copies. Pricing Member Price* $41. 00 Non Member Price $114. 00 *Must

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products